Utica College Fieldhouse
In this two part project, we installed two independent air inflation units, supporting one of the biggest Yeadon Fabric Domes in the northeast, fitting an eight lane by 200-meter track. Each Temprite unit consisted of three tractor trailer sized components that wrre craned and set in place to deliver conditioned air to the 135,000 square foot structure via sub-level cement duct network. In the second part of this project, Anchor Heating worked on an additional facility that led to the entrance of the dome.
Inflation Dome Pressurization Equipment:
- Two Temprite Pressurization Units (totaling approximately 7 million BTU's of heat)
- Two Train air-cooled condensing units (160 tons of cooling)
Sheet Metal Fabrication
We designed and fabricated all ventilation systems for this project.
HVAC Installation
Our team works promptly and safely to deliver Utica College a state of the art system.
Project Consultation
Let's look over the plans and discuss the best way to execute.
Sheet Metal Fabrication
We designed and fabricated all ventilation systems for this project.
Testing & Routine Maintenance
We believe in lifelong clients, after testing we follow up with routine maintenance.